EXVISTA LED 1200W floodlights have been installed at the Incheon Munhak Stadium baseball field.

Year of installation: 2021


Client: Incheon Munhak Stadium


Project Name: 2021 Professional Baseball Incheon Munhak Stadium SSG Landers Field XVista Sports Floodlight Installation Completed


Construction of EXVISTA LED floodlights has been completed at SSG Landers Field, Incheon Munhak Baseball Stadium.


As the professional baseball team changed from SK to SSG, the stadium lighting also changed from the existing metal halide lighting.

Replaced with high-efficiency LED sports professional lighting.


A total of 100 lights were installed in the outfield, 50 EA on each side of the tower.


The catwalk lighting above the infield stands was equipped with 208 EA lighting.

All floodlights are equipped with cut-off visors to minimize glare.



Using EXVISTA LED 1200W, over 3000 lx in the infield and over 2000 lx in the outfield.

We designed the optimal illuminance to match the standard illuminance of professional baseball games.


The actual measured illuminance was also over 3000lx in the infield and 2000lx in the outfield, making it possible to operate and watch the game more comfortably.

Existing lights take a long time to turn on and off, making it impossible to control events using lights, but Exvista LED products provide immediate

It is controllable, allowing you to create various event effects using lighting throughout the stadium.


The existing lighting was replaced with the latest EXVISTA LED 1200W lighting from the old metal halide 2kw product.

You can expect energy (electricity) savings of more than 40% compared to before.


A cut-off visor mounted on each floodlight minimizes glare on players and spectators and prevents light pollution that may occur in the surrounding area.


Professional competitions require appropriate lighting design and installation, as well as excellent lighting products.

EXVISTA high-output LED floodlights are optimized for professional players, spectators, and game broadcasts, allowing for accurate and quick installation. 


Based on accurate pre-lighting simulation, lights are placed at the optimal angle and the optimal amount of light is calculated for each light for construction.

Aiming is done to avoid the possibility of complaints through a visor that minimizes the user's glare.

In addition, the lighting design and construction were carried out by considering the vertical illuminance so that the flying batted ball can be clearly seen.


If you want a level worthy of a professional, please contact Jinwoo Eltech, a sports lighting specialist with many years of know-how and construction performance.

Our construction method is a patented method that reduces construction time by 75% compared to other companies, enabling quick installation.

The construction is completed neatly within a short construction period.


Not only sports lighting, but also fixed lighting towers, smart moving multi-stage lighting towers, ascending and descending lighting towers, and Y towers.

Even the concrete foundation is manufactured and constructed in-house.

We operate a direct A/S team to enable fast and prompt processing. A/S 1899-7163